广西外墙变形缝厂家直销JCDM型价格
广西外墙变形缝厂家直销JCDM型价格
产品价格:¥58(人民币)
  • 规格:JCDM
  • 发货地:贵州黔西南布依族苗族自治州
  • 品牌:
  • 最小起订量:1米
  • 免费会员
    会员级别:试用会员
    认证类型:企业认证
    企业证件:通过认证

    商铺名称:贵州坚策建材有限公司

    联系人:钱稳(先生)

    联系手机:

    固定电话:

    企业邮箱:694675944@qq.com

    联系地址:贵州省黔西南布依族苗族自治州兴义市木贾办枫塘村大寨组142号

    邮编:562400

    联系我时,请说是在五金机电网上看到的,谢谢!

    商品详情
      Technical Data:
      Aluminum
      ? Extrusion – C/S uses multiple alloys & tempers which are established to be the most appropriate for the given use of individual parts. Will be one of the following: (6063-T5, T6, T52) (6061-T5, T6, T51) (6105-T5, T6) (6005-T5) (6005A-T5, T61), ASTM B221
      ? Sheet – 6061-T6, 3003-H14, 5005-H34, ASTM B209
      Turnbar
      ? Material – C1075 Blue Temper Spring  Steel
      ? Hardness - RC 44-47
      ? Finish - “A” Coating (Corrosion  Protection)
      Standard Loading
      ? 500 lbs.
       

      Product Description:
      This flush mounted metal floor cover is designed for interior or exterior applications. The joint can be designed for up to 100% movement.
       
      Use This Cover For:
      ? Interior or exterior seismic applications.
      ? Applications requiring movements up to 100% of joint width.
      ? Larger sizes available (contact  factory).
      ? Optional waterstop available for wet areas.
       
      Performance Characteristics:
      Self-centering aluminum center plate remains flush during thermal movement, but temporarily displaces and slides over floor surface during seismic movement.
       

      Standard Finishes:
      Mill finish. Aluminum surfaces in contact with concrete will be pro- tected with a minimum 2 mil coating of a heavy metal free high sol- ids primer.
       
      Installation  Guidelines:
      The blockouts must be prepared to receive the joint cover. It is rec- ommended that the blockout be formed a minimum of 1/8” deeper  to allow the base to be leveled prior to installation of the joint cover.
      Apply a high-strength leveling grout to the base of the blockouts to provide a continuous, solid, flat and level base for the joint cover. (Note: The blockouts must be level across the joint opening.) Install
      base frames with C/S supplied fasteners. Fasten cover plate to frames with turnbar. Based on the size of the joint, there are recommended tips and tricks for installation at this point. For complete installation instructions,  please  visit
    在线询盘/留言
  • 0571-87774297